top of page

St Pauls School

0014_jaseimages_130423.jpg

Key Architectural/Design Elements include:
- Underwater Cameras to monitor Recovery
- Covered Pool with Shade Sail Structure fully Floodlit for night training
 

Design & Construct of a new 25m heated recovery pool with 2 plunge pools, one heat recovery and one cold recovery, along with a Swimex resistance swim machine.
A Dry Land Recovery Area (Specialised Gym) was constructed all to aid the recovery of Elite Athletes whether in the Pools or in the Dry Recovery Area.
 

ABN: 61 120 743 099   |   QBCC: 1218054   |   FSC: 660    |   admin@evansbuilt.com.au   |   ph. 07 5353 5050    | 

bottom of page