top of page

Murrumba State Secondary College

0041_Jaseimages_07042020.jpg


Key Architectural/Design Elements include:
The Music building is a single level structure consisting of 3 music GLA’s multiple practice rooms & ensemble rehearsal spaces. High acoustic performance materials & construction techniques were utilised throughout construction. The Industrial Kitchen is a 200m2 single level structure inclusive a commercial training kitchen, scullery & store / cool room facilities.

Works include: 

Multi-Story Learning Centre, Music building & Industrial Kitchen.Substantial civil works were required to prepare the site for the Multi-Story Learning Centre including the reclaiming of an existing dam. The Multi Story Leaning Centre consists of 3 levels, 10 GLA’s, Robotics & Science labs. Externally has terraced seating leading onto substantial landscaping works overlooking the dam.

bottom of page